How to Calculate OEE for a Production Line

Share

In manufacturing operations, Overall Equipment Effectiveness, or OEE in short, is the gold standard for measuring productivity.

Overall Equipment Effectiveness is a simple but powerful metric that has been used for decades, although it gained mainstream popularity in the last decade or so. Since then, OEE has helped many teams and organizations visualize, monitor, and reduce inefficient usage of equipment and waste.

However, many people are still confused about the concept of OEE and about the terms “effectiveness” and “efficiency,” and in this guide, we’ll address these things in a clear and comprehensive way.

In this guide to OEE, you’ll learn about:

  • What is Overall Equipment Effectiveness (OEE)
  • OEE as part of Total Productive Maintenance (TPM)
  • Why is calculating OEE important for your business?
  • Three components of OEE: Availability (A), performance (P), and quality (Q)
  • How to calculate OEE for multiple machines (with examples)

And more.

Let us begin this guide with the basics: what is Overall Equipment Effectiveness?

What is Overall Equipment Effectiveness?

shift-handover-

Efficiency vs. Effectiveness

To really understand OEE, we have to make sure we understand the definition of “effectiveness” as opposed to “efficiency.”

The two terms have often been used interchangeably, but although they are related, they aren’t one and the same. Both terms essentially mean “capable of producing the desired result,” however there is an important difference between the two:

  • Effectiveness: the degree to which something is successful in producing the desired result
  • Efficiency: the ability of something to achieve the desired research with the least amount of wasted time, money, resources, and effort.

For example, assume a piece of equipment can technically produce 1,000 products an hour but somehow only produces 800 items an hour. In this case, the equipment is 80% effective.

On the other hand, out of these 800 items, 200 (25%) are considered defective. In this case, the equipment is considered only 75% efficient.

Thus, a piece of equipment can be only 50% effective but 100% efficient, and vice versa; it can be 100% effective but only 50% efficient.

When calculating OEE, it’s crucial to understand that we are discussing effectiveness instead of efficiency.

OEE as Part of Total Productive Maintenance (TPM)

OEE is a measurement method used in Total Productive Maintenance (TPM) programs, which is a methodology designed to improve productivity in the workplace by ensuring all processes are more reliable and energy-efficient.

The main purpose of TPM is to maintain equipment so that it stays in optimal condition for as long as possible while minimizing issues and damages.

TPM implementation has three ideal objectives:

  1. Zero product defect
  2. Zero unplanned equipment failures
  3. Zero accident

In the context of TPM, OEE is an important metric in TPM implementation that is useful as a baseline and a benchmark:

  • OEE is useful in establishing a baseline in TPM for accurately tracking progress over time in improving effectiveness and eliminating waste.
  • OEE is also useful as a benchmark to compare the performance of any piece of equipment to another piece, to industry standards, or to results for different shifts of the same equipment.

OEE: Practical Definition

OEE is a standardized methodology to measure a piece of equipment’s effectiveness during the defined operative mode or period in which all activities are related to production.

Measuring OEE essentially enables the organization and/or management to understand three things:

  1. How often is the piece of equipment available to run? (Availability)
  2. How fast does it produce the desired number of products when it’s running? (Performance)
  3. How many products are considered acceptable? (Quality)

While considering these three key OEE elements, the formula for calculating OEE is as follows:

Overall Equipment Effectiveness= Availability x Performance x Quality

Why is OEE Important and How Is It Calculated?

OEE is the primary indicator of a machine’s performance. So for most manufacturing companies, it is beneficial to know, how to calculate OEE for multiple machines due to three main reasons:

  1. Knowing your production baseline

By knowing your actual OEE and the ideal OEE score to pursue, you can determine the ideal performance of your equipment to ensure your business stays profitable. Set a lower OEE limit knowing that if you stay above this number, your production is profitable.

  1. Knowing when to perform maintenance

When your equipment’s OEE score suddenly goes below its usual level and stays there, it’s a sign that your machine needs maintenance and (probably) repairs.

A Low OEE score can help you troubleshoot your machine, identify potential issues, and figure out what needs to be done to bring back its optimal performance.

  1. Knowing which machine is underperforming

If your manufacturing company has multiple machines, then calculating OEE can help you identify which machine is currently underperforming so you can fix the issue and improve productivity.

Three Core Elements in OEE Calculation: Availability, Performance, and Quality

  1. Availability (A)

Availability refers to how long (in a unit of time) a piece of equipment is available to operate, divided by the operative mode time (the total possible available time).

Availability takes breakdowns/unplanned downtime and planned downtime into account, including meetings, lunch breaks, and other regularly scheduled breaks.

Availability= B/A, in which:

A=Total operative mode time

B=Run time

A-B=downtime

  1. Performance (P)

Performance refers to how fast the piece of equipment runs while it is running within the operative mode time.

A 100% performance score means the process is running as fast as the machine is theoretically capable of running during the total available time.

Performance takes calculated speed loss into account, including human error, material mistakes, stuck material, etc.

Performance=D/C, in which:

C=Optimal operational speed

D=Actual speed

C-D=speed loss

  1. Quality (Q)

Quality refers to the number of products that are within specification or requirement compared to the total number of products produced.

A 100% score in quality means there are 0 defects.

Quality=F/E, in which

E=Total products produced

F=Accepted products

E-F=product waste

Considering all these elements, we can use the following formula:

OEE = B/A x D/C x F/E

OEE Score Benchmarks

DigiView - Paperless Manufacturing Software (Landing Page Video)

What is considered a good OEE score? Below is the commonly accepted benchmark:

  1. 100% OEE score is, as you might have guessed, perfect production. The equipment is capable of producing only good products as fast as possible without any stop time.
  2. 85% OEE score is considered word class. For most companies and discrete manufacturers, this is a sustainable long-term goal to pursue.
  3. 60% OEE score is considered typical for most manufacturers, but there’s room for improvement.
  4. 40% OEE score is considered low, but it is not uncommon for many manufacturing companies. Typically this low score can be easily improved by fixing obvious issues and implementing fairly simple improvements.

Example of OEE Calculation

Let’s assume we have a machine that operates with the following details:

  • The total operative mode time is 12 hours
  • The machine only operates for roughly 10 hours during a working day
  • The machine can theoretically produce 2,500 products per hour (so 30,000 products in a working day.) However, in practice, it can only produce 25,000 products per day.
  • Due to speed and minor stops, it only produced 22,000.
  • Out of the 22,000 products produced in a day, only 21,000 meet the desired specification.

Based on this data, we can calculate:

Availability score  = Run time/total operative mode time

= 10/12

=83.3%

Performance score = Actual speed/Optimal operational speed

=22,000/25,000

=88%

Quality score = Accepted products/total products produced

=21,000/22,000

=95.5%

Last but not least, we can finally calculate the OEE score of the machine:

OEE= Availability score x Performance score x Quality score

       = 83.3% x 88% x 95.5%

=70%

Which is the same as 21,000/30,000=70%, but now we have a breakdown of the areas of loss to address.

In this example, the equipment has a typical OEE score with a pretty big room for improvement.

Best Practices to Improve OEE and Productivity

Once you’ve calculated OEE for your machine or multiple machines, how can you improve upon it?

OEE can be improved in many different ways: identifying and eliminating bottlenecks, improving maintenance schedules, developing better workflows, and so on. However, the actual answer would depend on the state of each piece of equipment and the specific effectiveness issues it is currently facing.

Below, we will discuss some actionable strategies you can use to improve OEE:

1. Prioritize the most important pieces of equipment

In practice, improving OEE on all assets can be time-consuming and not cost-effective, so you’ll need to prioritize.

It’s best to focus your resources and time on improving assets and equipment that are most mission-critical and, ideally, those that can help improve other assets up and down the value chain with the only effort directed on this single piece of equipment.

2. Automate data collection

Another important strategy to improve OEE is to automate production data collection and reporting by implementing OEE data collection software.

The faster and the more immediate you gain access to production data, the faster you can identify bottlenecks and issues, and the faster you can troubleshoot the issues ASAP. Not only that, but manual data collection is both time-consuming and error-prone, which may contribute to lowering the OEE score.

Fortunately, thanks to advancements in technology and especially IoT (Internet of Things) implementations, it’s much easier and more affordable to automate data collection, analytics, and data reporting processes.

3. Use Root Cause Analysis (RCA) to grasp your OEE’s origination points

The OEE score of each machine might seem simple, but in reality, understanding why the score is that way can be quite complex.

For example, it’s possible that the low OEE of a machine happens due to an issue that happens much earlier in the production process caused by another machine, which can be quite difficult to identify in practice.

With that being said, it’s recommended to use Root Cause Analysis (RCA) to help you understand the core cause of a problem and, in this case, the root cause of the OEE score.

RCA consists of six key steps:

  1. Define the event
  2. Identify the potential causes
  3. Determine the root cause
  4. Find potential solutions
  5. Take action
  6. Evaluate and verify solution effectiveness

Knowing and addressing the root cause of the OEE is the only viable solution instead of only treating symptoms. This can help you prevent the OEE losses from recurring in the future.

4. Make sure all production stops are addressed

Another key strategy to improve the OEE of your machines is to make sure all production stops are properly addressed to create visibility of your production’s downtime.

The basic approach you can take is to simply ask your supervisors to comment on each stop and check them at the end of each shift. The supervisors must aim to understand why each stop (especially unplanned ones) happens and add a comment on their report.

Ultimately, the goal is to develop a more thorough understanding of your production’s downtime and how to prevent them from happening in the future.

5. Pay attention and improve the working environment

Various negative conditions in the working environment can improve an equipment’s OEE. Excess dust inside the machine, for example, can significantly affect equipment OEE. Poor lighting conditions may also affect factory workers in operating the machines, lowering OEE.

Identify potential issues in the working environment surrounding the machine that may affect OEE, and fix the issues accordingly.

Conclusion

In this post, you have learned about Overall Equipment Effectiveness (OEE), how to calculate OEE for a production line, as well as important strategies and best practices you can do to improve your machines’ OEE.

It’s important to remember that OEE scores of machines will vary at different times of operations and on different days depending on many different factors, so the manual calculation and monitoring of OEE is not recommended.

Instead, using visual factory software can help you monitor machine downtime and the OEE metrics of each production line in real-time, so you can more quickly and accurately calculate the OEE score.

Ultimately, keeping track of OEE for all machines can help you maintain and improve your business’s performance both in qualitative and quantitative ways.

Learn more

Latest news